SUSTAINABLE EUGENE?
Eugene Sustainability Quiz
Eugene Sustainability Commission
steps toward sincere sustainability
City Manager or democracy?
Regional Transportation Plan: $817 million for roads
2010-2015: Cities & County $186.5 million for roads
EWEB's $85 million new maintenance yard
U of O Arenas - Bus Rapid Transit - big box stores
hospitals - disasters - intelligent urban design - trains
grass seed to grains - food security, no more field burning

WEST EUGENE PORKWAY
WETLANDS: West Eugene Transportation, Land and Neighborhood Design Solutions - WEP alternative
Mayoral Election bypasses highway history
Kitty Piercy's West Eugene Collaborators excluded neighborhood groups, tolerates half a WEP
Jim Torrey wasted money promoting WEP after June 2001 "No Build" consensus by Fed, State, County & City
the 2001 City vote for the WEP - a federal, not local, decision
WEP violated laws signed by Nixon and LBJ
Lane County: Bobby Green vs. Rob Handy

related websites: forestclimate.org - oilempire.us - permatopia.com - road-scholar.org
feedback to mark at permatopia dot com


WETLANDS:
West Eugene Transportation, Land and Neighborhood Design Solutions

SLIDESHOW:
virtual tour, hidden history

2 page summary (pdf)

Permanent Cancellation?
WEP not 100% dead yet

WEP removed from State Transportation plan November 2006, Feds issued No Build decision March 2007

  • ODOT needs to transfer wetlands to BLM for permanent cancellation - put a survey stake through WEP's heart
  • City of Eugene needs to rename City owned parcels as "parkland" to prevent a new WEP proposal

West Eugene Collaborative: two flavors of elites exclude 9 neighborhood groups
welcomes proposal for reviving half of the WEP

Fake Alternatives

top lies about WEP

WEP a Federal, not city, decision

WETLANDS alternative

  • Cost of Alternative ($17, $88 or $169 million)
  • Purpose and Need met by WETLANDS (not by WEP)
  • Avoidance criteria met by WETLANDS
  • Roosevelt Blvd. is a better connector between Beltline and 99, it serves northwest Eugene neighborhoods better than WEP could. Some local traffic would use Roosevelt, regional through traffic would bypass on Belt Line.
  • transfer WEP money to finish Beltline, fix Roosevelt / 99 intersection
    two options for completing Beltline: (1) if Peak Oil is here, (2) if Peak Oil is not yet here. The larger option could convert Beltline to an interstate highway - perhaps I-605?
  • transfer ODOT / City lands for WEP to BLM's West Eugene Wetlands Project
  • new roads: First - 99 - Second Connector, Barger Road Extended & Trainsong Connector (to NW Expressway)
  • fix West 11th intersections (would cost about $2 million, the cost to complete WEP study), other road repairs
  • bicycle paths and lanes, pedestrian safety enhanced by road test for drivers license renewals
  • land use shifts to coordinate transit and development, mixed use centers, co-housing neighborhoods
  • "Saving Oil in a Hurry" - practical steps toward coping with sudden energy shortages, road safety, speed limits
  • upgrade Amtrak to enable high speed trains to Seattle
  • Second and Garfield: ideal location for Eugene's new hospital (central & accessible)
  • I-5 / Beltline interchange: a practical, cheaper alternative ignored by ODOT
    I-5 Willamette River Bridge: a cheaper alternative
  • Bus Rapid Transit on Hwy 99 instead of WEP makes more sense

the money was not there

WEP would worsen traffic

articles

WEP dictionary

hidden history of the WEP

maps

one of the most illegal highways ever

West Eugene Wetlands

 

Eugene's 1967 highway plan

Note the Roosevelt Freeway (original WEP idea), the Skinner Butte Freeway, the extension of I-105 to Amazon Creek, freeways through downtown Eugene, and last, but not least, the Beltline extension over Bailey Hill into the South Hills along the Ridgeline trail and past Spencer's Butte to LCC ...

A few years after this plan, Oregon enacted land use laws to establish urban growth boundaries and make the initial efforts to control sprawl overdevelopment.

Note also the new highway along Amazon Creek (south of west 11th), a new road paralleling the Willamette River north of the "number 2" (outside the Urban Growth Boundary, this project is still called for in the "TransPlan").

eugene1967plan