SUSTAINABLE EUGENE?
Eugene Sustainability Quiz
Eugene Sustainability Commission
steps toward sincere sustainability
City Manager or democracy?
Regional Transportation Plan: $817 million for roads
2010-2015: Cities & County $186.5 million for roads
EWEB's $85 million new maintenance yard
U of O Arenas - Bus Rapid Transit - big box stores
hospitals - disasters - intelligent urban design - trains
grass seed to grains - food security, no more field burning

WEST EUGENE PORKWAY
WETLANDS: West Eugene Transportation, Land and Neighborhood Design Solutions - WEP alternative
Mayoral Election bypasses highway history
Kitty Piercy's West Eugene Collaborators excluded neighborhood groups, tolerates half a WEP
Jim Torrey wasted money promoting WEP after June 2001 "No Build" consensus by Fed, State, County & City
the 2001 City vote for the WEP - a federal, not local, decision
WEP violated laws signed by Nixon and LBJ
Lane County: Bobby Green vs. Rob Handy

related websites: forestclimate.org - oilempire.us - permatopia.com - road-scholar.org
feedback to mark at permatopia dot com

 

“Avoidance, then Minimization”
analysis for 4(f), wetlands and LWCF impacts
requires selection of WETLANDS alternative over any WEP route

Avoidance

WETLANDS Alternative
$17 million option
Categorical Exclusion?

No Build for WEP, safety improvements to Belt Line, West 11th expressway west of Belt Line, Roosevelt / 99 intersection repair, West 11th intersection repairs, land use shifts, Bus Rapid Transit to Bethel and west 11th. Added turn lanes at West 11th / Belt Line may or may not fit into current right-of-way (if not, then minor 4(f) / LWCF impacts and Environmental Assessment would be required)

Minimization

WETLANDS Alternative
$88 million option
update 1995 Beltline Environmental Assessment

All of the above plus addition of grade-separated interchange at Roosevelt / Belt Line and partial interchange at West 11th / Belt Line intersection (flyover ramp from eastbound 11th to northbound Belt Line plus wide curve from southbound Belt Line to westbound 11th). Similar to ODOT recommendation at June 2001 “West Eugene Charette” - “No Build” for WEP, widen Belt Line and widen West 11th, plus a West 11th / Belt Line interchange.
Options for the WEP
Minimal avoidance
FHWA Southern Alignment (June 2006)
new EIS so Cooperating Agencies can participate in scoping of alternatives
The 2006 FHWA Southern Alignment has miniscule levels of minimized impact over the "Alternative A / Modified Project" north of the railroad tracks. Both options fail to examine the full impact of wetland destruction caused by the proposed WEP / Beltline interchange (since temporary roads would fill in additional wetlands), the independent utility and logical termini problems, the traffic problems caused by the WEP, and the existence of a prudent and feasible alternative to any version of the WEP.

No avoidance, no minimization
“Modified Project” (1997),
Alternative A Mitigated (2003)

The 1997 route would be twice as wide through the BLM lands as the 1990 route, requiring more acres of wetland destruction, 4(f) impacts and LWCF land transfers. WEP Alternative A Mitigated would have more than twice the acreage of wetland destruction as described in the 1997 SDEIS.

No avoidance, no minimization, failure to disclose all impacts

 

The ultimate termini of the WEP are Veneta and I-105. A full disclosure of all WEP impacts would include tributary road projects (stated and unstated), mitigation for congestion (wider intersections and possible future grade separations, especially at Seneca), WEP extended west along 126 to Veneta, possible WEP to I-105 connector
Compensatory mitigation is not possible There are no other large, contiguous wetland prairies to acquire and protect along Amazon Creek in the West Eugene Wetlands.